The solution involved the following key components:
Check out our capability statement for a deeper dive into our highly competitive market offering.
Let’s do this together. Get in touch with our team.
The Carrapateena project included HDPE pipework construction with trunk lines, pump stations, bore field piping, mills piping, commissioning, hydrostatic testing, valve installation, and QA/QC control.
The solution involved tank remediations, alterations to plinths, and the fabrication and installation of a new Cons Leach Tank.